2MILES

M6 Northbound

2.79 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J25 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J25 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : All lanes will be closed.

2.1MILES

M6 Southbound

3.37 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound within J23 | Southbound | Road Works

Location : The M6 southbound between junctions J24 and J23 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 March 2024 to 06:00 on 22 March 2024. Lanes Closed : There will be three of four lanes closed.

Hotels near WN25LY

2.2MILES

M6 Northbound

3.11 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J23 and J24 | Northbound | Road Works

Location : The M6 northbound between junctions J23 and J24 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of four lanes closed.

2.2MILES

M6 Northbound

3.36 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J24 northbound access | Northbound | Road Works

Location : The M6 northbound entry slip at junction J24 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : All lanes will be closed.

2.2MILES

M6 Southbound

2.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound within J23 | Southbound | Road Works

Location : The M6 southbound between junctions J24 and J23 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of four lanes closed.

Spending a fortune on conveyancing?

Conveyancing Quotes

Compare instant, low-cost online quotes from trusted conveyancing solicitors.

Backed by experts, our no-obligation service searches through the best conveyancing quotes on the market to save you time and money.

Instant quotes
No obligation
Backed by experts
Stress free
Fully compliant
GET QUOTES NOW
2.2MILES

M6 Southbound

2.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound exit | Southbound | Road Works

Location : The M6 southbound between junctions J24 and J22 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 19 March 2024 to 06:00 on 25 March 2024.

2.2MILES

M6 Southbound

2.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound within J23 | Southbound | Road Works

Location : The M6 southbound between junctions J24 and J23 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 21 March 2024. Lanes Closed : There will be two of four lanes closed.

2.5MILES

M6 Northbound

2.06 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J23 northbound access | Northbound | Road Works

Location : The M6 northbound entry slip at junction J23 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 21 March 2024. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : All lanes will be closed.

2.6MILES

M6 Southbound

1.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J23 southbound access | Southbound | Road Works

Location : The M6 southbound entry slip at junction J23 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : All lanes will be closed.

2.6MILES

M6 Southbound

2.85 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J25 and J24 | Southbound | Road Works

Location : The M6 southbound between junctions J26 and J23 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 19 March 2024 to 06:00 on 20 March 2024. Lanes Closed : There will be two of four lanes closed.

2.7MILES

M6 Northbound

1.87 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J23 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J23 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Schedule : From 21:00 on 21 March 2024 to 05:00 on 22 March 2024. Lanes Closed : All lanes will be closed.

2.7MILES

M6 Northbound

1.87 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J23 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J23 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 15 March 2024 to 06:00 on 16 March 2024. Lanes Closed : All lanes will be closed.

2.7MILES

M6 Southbound

1.74 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J23 and J22 | Southbound | Road Works

Location : The M6 southbound between junctions J23 and J22 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : All lanes will be closed.

2.9MILES

M6 Southbound

1.25 mile of Newton-le-Willows
3/15/2024 at 07:49
Source: Highways Agency
No Delay

M6 southbound between J23 and J22 | Southbound | Broken down vehicle

Location : The M6 southbound between junctions J23 and J22 . Lane Closures : Lane one is closed. Reason : Broken down vehicle. Status : Currently Active. Time To Clear : The event is expected to clear between 08:15 and 08:30 on 15 March 2024. Return To Normal : Normal traffic conditions are expected between 08:15 and 08:30 on 15 March 2024. Lanes Closed : There is one of four lanes closed.

3MILES

M6 Northbound

1.04 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J22 and J23 | Northbound | Road Works

Location : The M6 northbound between junctions J22 and J23 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of four lanes closed.

3MILES

M6 Northbound

1.04 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J23 and J24 | Northbound | Road Works

Location : The M6 northbound between junctions J22 and J24 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 21 March 2024. Lanes Closed : There will be two of four lanes closed.

3.1MILES

M6 Southbound

0.98 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J23 and J22 | Southbound | Road Works

Location : The M6 southbound between junctions J23 and J22 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 19 March 2024 to 06:00 on 20 March 2024. Lanes Closed : There will be two of four lanes closed.

3.8MILES

M6 Northbound

3.38 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J25 and J26 | Northbound | Road Works

Location : The M6 northbound between junctions J25 and J26 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be three of four lanes closed.

4MILES

M6 Northbound

3.37 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be three of four lanes closed.

4MILES

M6 Northbound

3.37 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J26 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J26 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : All lanes will be closed.

4MILES

M6 Southbound

3.34 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J26 southbound exit | Southbound | Road Works

Location : The M6 southbound exit slip at junction J26 . Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : All lanes will be closed.

4.1MILES

M6 Northbound

3.33 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : The hard shoulder is closed. Reason : Road repairs. Status : Currently Active. Period : expect disruption until 20:00 on 15 March 2024.

4.2MILES

M6 Northbound

3.33 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 20:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of three lanes closed.

4.2MILES

M6 Northbound

3.33 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2024 to 20 March 2024. Lanes Closed : There will be two of three lanes closed.

4.2MILES

M6 Northbound

3.33 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 20:00 on 15 March 2024 to 06:00 on 16 March 2024. Lanes Closed : There will be two of three lanes closed.

4.2MILES

M6 Northbound

3.33 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 06:00 on 23 March 2024 to 16:00 on 23 March 2024. Lanes Closed : There will be one of three lanes closed.

4.2MILES

M58 Westbound

3.49 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M58 westbound between M6 and J5 | Westbound | Road Works

Location : The M58 westbound between junctions M6 and J5 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 30 March 2026.

4.5MILES

M6 Southbound

0.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound exit | Southbound | Road Works

Location : The M6 southbound exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2024 to 25 March 2024. Lanes Closed : All lanes will be closed.

4.5MILES

M6 Southbound

0.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound exit | Southbound | Road Works

Location : The M6 southbound exit slip at junction J22 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 16 March 2024 to 06:00 on 18 March 2024.

4.5MILES

M6 Southbound

0.76 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound exit | Southbound | Road Works

Location : The M6 southbound exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2024 to 18 March 2024. Lanes Closed : All lanes will be closed.

4.6MILES

M58 Westbound

3.68 mile of Skelmersdale
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M58 westbound between J3 and J1 | Westbound | Road Works

Location : The M58 westbound between junctions M6 and J1 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 30 March 2026.

4.6MILES

M58 Eastbound

3.68 mile of Skelmersdale
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M58 eastbound between J5 and M6 | Eastbound | Road Works

Location : The M58 eastbound between junctions J5 and M6 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 30 March 2026.

4.6MILES

M6 Northbound

0.87 mile of Newton-le-Willows
3/15/2024 at 04:58
Source: Highways Agency
Roadworks

M6 J22 northbound access | Northbound | Road Works

Location : The M6 northbound entry slip at junction J22 . Reason : Roadworks. Status : Currently Active. Period : from 22:09 on 14 March 2024 to 06:00 on 15 March 2024. Lanes Closed : All lanes are closed.

4.7MILES

M6 Northbound

0.93 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 northbound access | Northbound | Road Works

Location : The M6 northbound entry slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2024 to 25 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Northbound

0.93 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 northbound access | Northbound | Road Works

Location : The M6 northbound entry slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 15 March 2024 to 18 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Southbound

0.95 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J22 and J21A | Southbound | Road Works

Location : The M6 southbound between junctions J22 and J21A . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be two of four lanes closed.

4.7MILES

M6 Southbound

0.98 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound access | Southbound | Road Works

Location : The M6 southbound entry slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2024 to 25 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Southbound

0.98 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 southbound access | Southbound | Road Works

Location : The M6 southbound entry slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2024 to 18 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Northbound

0.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J22 and J23 | Northbound | Road Works

Location : The M6 northbound between junctions J22 and J23 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Northbound

0.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound within J23 | Northbound | Road Works

Location : The M6 northbound between junctions J22 and J23 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 15 March 2024 to 06:00 on 16 March 2024. Lanes Closed : All lanes will be closed.

4.7MILES

M6 Northbound

0.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound within J23 | Northbound | Road Works

Location : The M6 northbound between junctions J22 and J23 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:05 on 12 March 2024 to 06:00 on 18 March 2024.

4.9MILES

M6 Southbound

3.69 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J27 and J26 | Southbound | Road Works

Location : The M6 southbound between junctions J27 and J26 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : There will be one of three lanes closed.

4.9MILES

M6 Northbound

1.18 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 March 2024 to 18 March 2024. Lanes Closed : All lanes will be closed.

4.9MILES

M6 Northbound

1.18 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound within J22 | Northbound | Road Works

Location : The M6 northbound at junction J22 . Lane Closures : Lanes 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Lanes Closed : There will be two of four lanes closed.

4.9MILES

M6 Northbound

1.18 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 northbound exit | Northbound | Road Works

Location : The M6 northbound exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 March 2024 to 25 March 2024. Lanes Closed : All lanes will be closed.

5.4MILES

M61 Northbound

2.26 mile of Horwich
3/15/2024 at 05:07
Source: Highways Agency
Roadworks

M61 northbound between J5 and J6 | Northbound | Road Works

Location : The M61 northbound between junctions J5 and J6 . Lane Closures : Lane one is closed. Reason : Roadside Drains Works. Status : Currently Active. Period : expect disruption until 05:00 on 15 March 2024. Lanes Closed : There is one of three lanes closed.

5.4MILES

M6 Northbound

1.83 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J21A and J22 | Northbound | Road Works

Location : The M6 northbound between junctions J21A and J22 . Lane Closures : Lane three will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Lanes Closed : There will be one of three lanes closed.

5.4MILES

M6 Northbound

1.83 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J21A and J22 | Northbound | Road Works

Location : The M6 northbound between junctions J21A and J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of three lanes closed.

5.4MILES

M61 Northbound

1.97 mile of Horwich
3/15/2024 at 05:07
Source: Highways Agency
Roadworks

M61 J6 northbound exit | Northbound | Road Works

Location : The M61 northbound exit slip at junction J6 . Lane Closures : Lane one is closed. Reason : Roadside Drains Works. Status : Currently Active. Period : expect disruption until 05:00 on 15 March 2024. Lanes Closed : There is one of two lanes closed.

5.5MILES

M6 Northbound

4.07 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J26 and J27 | Northbound | Road Works

Location : The M6 northbound between junctions J26 and J27 . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 06:00 on 16 March 2024 to 11:00 on 16 March 2024. Lanes Closed : There will be one of three lanes closed.

5.5MILES

M61 Southbound

2.75 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J5 and J4 | Southbound | Road Works

Location : The M61 southbound between junctions J6 and J4 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 March 2024 to 05:00 on 16 March 2024. Schedule : From 22:00 on 18 March 2024 to 05:00 on 19 March 2024. Lanes Closed : There will be two of three lanes closed.

5.5MILES

M61 Southbound

2.75 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J5 and J4 | Southbound | Road Works

Location : The M61 southbound between junctions J6 and J4 . Reason : Roadworks scheme. Status : Currently Active. Period : from 20:09 on 13 March 2024 to 05:00 on 19 March 2024.

5.8MILES

M62 Eastbound

1.89 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound within J9 | Eastbound | Road Works

Location : The M62 eastbound at junction J9 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : There will be two of three lanes closed.

5.8MILES

M62 Eastbound

1.91 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J9 and J10 | Eastbound | Road Works

Location : The M62 eastbound between junctions J9 and J10 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : There will be two of four lanes closed.

5.8MILES

M62 Eastbound

1.96 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J9 and J10 | Eastbound | Road Works

Location : The M62 eastbound between junctions J9 and J10 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be one of four lanes closed.

5.8MILES

M62 Eastbound

1.96 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 J10 eastbound to M6 J21A | Eastbound | Road Works

Location : The M62 eastbound between junctions J9 and J10 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 22 March 2024.

5.8MILES

M6 Northbound

2.3 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M6 J21A northbound to M62 J10 eastbound | Northbound | Road Works

Location : The M6 northbound exit slip at junction J21A to M62 east. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : All lanes will be closed.

5.8MILES

M6 Northbound

2.19 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 J10 eastbound to M6 J21A northbound | Northbound | Road Works

Location : The M6 northbound entry slip at junction J21A . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 21 March 2024. Lanes Closed : All lanes will be closed.

5.9MILES

M62 Eastbound

2.2 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 J10 eastbound to M6 J21A | Eastbound | Road Works

Location : The M62 eastbound exit slip at junction J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 21 March 2024. Lanes Closed : All lanes will be closed.

5.9MILES

M62 Eastbound

2.17 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound within J10 after M6 J21A northbound access | Eastbound | Road Works

Location : The M62 eastbound at junction J10 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : There will be two of three lanes closed.

6MILES

M62 Eastbound

2.65 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J10 and J11 | Eastbound | Road Works

Location : The M62 eastbound between junctions J10 and J11 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 17 March 2024 to 05:00 on 18 March 2024. Lanes Closed : There will be two of four lanes closed.

6MILES

M61 Southbound

3.09 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 southbound exit | Southbound | Road Works

Location : The M61 southbound exit slip at junction J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 March 2024 to 05:00 on 16 March 2024. Lanes Closed : There will be one of two lanes closed.

6MILES

M61 Southbound

3.09 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 southbound exit | Southbound | Road Works

Location : The M61 southbound exit slip at junction J5 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 22:00 on 18 March 2024 to 05:00 on 19 March 2024. Lanes Closed : All lanes will be closed.

6MILES

M62 Westbound

2.86 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound within J10 before M6 J21A southbound access | Westbound | Road Works

Location : The M62 westbound at junction J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be two of three lanes closed.

6MILES

M62 Westbound

2.86 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 J10 westbound to M6 J21A | Westbound | Road Works

Location : The M62 westbound exit slip at junction J10 . Lane Closures : Lane one will be closed. Reason : Emergency roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 19 March 2024 to 05:00 on 20 March 2024. Lanes Closed : There will be one of two lanes closed.

6MILES

M62 Westbound

2.86 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound within J10 before M6 J21A southbound access | Westbound | Road Works

Location : The M62 westbound at junction J10 . Lane Closures : Lane one will be closed. Reason : Emergency roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 19 March 2024 to 05:00 on 20 March 2024. Lanes Closed : There will be one of three lanes closed.

6MILES

M61 Northbound

3.06 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 northbound access | Northbound | Road Works

Location : The M61 northbound entry slip at junction J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 21 March 2024 to 23 March 2024. Lanes Closed : There will be one of two lanes closed.

6MILES

M61 Northbound

3.06 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 northbound between J5 and J6 | Northbound | Road Works

Location : The M61 northbound between junctions J5 and J6 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 21 March 2024 to 05:00 on 23 March 2024.

6.1MILES

M61 Northbound

3.01 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 northbound between J5 and J6 | Northbound | Road Works

Location : The M61 northbound between junctions J5 and J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 21 March 2024 to 23 March 2024. Lanes Closed : There will be two of three lanes closed.

6.1MILES

M6 Southbound

2.77 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 westbound J10 to M6 southbound J21A | Southbound | Road Works

Location : The M6 southbound entry slip at junction J21A from M62 Westbound. Lane Closures : Lane one will be closed. Reason : Emergency roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 19 March 2024 to 05:00 on 20 March 2024. Lanes Closed : There will be one of two lanes closed.

6.1MILES

M6 Northbound

2.77 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

link road from M62 J10 westbound to M6 J21A northbound | Northbound | Road Works

Location : The M6 northbound entry slip at junction J21A from M62 westbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : All lanes will be closed.

6.1MILES

M61 Southbound

2.96 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 southbound access | Southbound | Road Works

Location : The M61 southbound entry slip at junction J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 March 2024 to 05:00 on 16 March 2024. Lanes Closed : There will be one of two lanes closed.

6.1MILES

M61 Southbound

2.96 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 southbound access | Southbound | Road Works

Location : The M61 southbound entry slip at junction J5 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 22:00 on 18 March 2024 to 05:00 on 19 March 2024. Lanes Closed : All lanes will be closed.

6.2MILES

M61 Northbound

2.96 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 J5 northbound exit | Northbound | Road Works

Location : The M61 northbound exit slip at junction J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 20 March 2024 to 06:00 on 21 March 2024. Lanes Closed : There will be one of two lanes closed.

6.2MILES

M62 Westbound

3.46 mile of Leigh
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J11 and J10 | Westbound | Road Works

Location : The M62 westbound between junctions J11 and J10 . Lane Closures : Lane one will be closed. Reason : Emergency roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 19 March 2024 to 05:00 on 20 March 2024. Lanes Closed : There will be one of four lanes closed.

6.3MILES

M62 Westbound

3.45 mile of Leigh
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J11 and J10 | Westbound | Road Works

Location : The M62 westbound between junctions J11 and J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be two of four lanes closed.

6.3MILES

M62 Westbound

3.45 mile of Leigh
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound within J10 before M6 J21A southbound access | Westbound | Road Works

Location : The M62 westbound between junctions J11 and J10 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 20 March 2024 to 06:00 on 22 March 2024.

6.3MILES

M6 Southbound

4.65 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J27 and J26 | Southbound | Road Works

Location : The M6 southbound between junctions J27 and J26 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 19 March 2024 to 22 March 2024. Lanes Closed : There will be two of three lanes closed.

6.4MILES

M61 Southbound

0.87 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J8 and J6 | Southbound | Road Works

Location : The M61 southbound between junctions J8 and J6 . Lane Closures : The hard shoulder is closed. Reason : Emergency roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 23 March 2024.

6.5MILES

M6 Northbound

2.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound within J22 | Northbound | Road Works

Location : The M6 northbound between junctions J21A and J22 . Lane Closures : Lanes 1, 2, 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : All lanes will be closed.

6.5MILES

M6 Northbound

2.97 mile of Newton-le-Willows
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J22 northbound exit | Northbound | Road Works

Location : The M6 northbound between junctions J21A and J22 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 18 March 2024 to 06:00 on 25 March 2024.

6.6MILES

M62 Westbound

3.27 mile of Warrington
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J8 and J7 | Westbound | Road Works

Location : The M62 westbound between junctions J8 and J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 18 March 2024 to 06:00 on 19 March 2024. Lanes Closed : There will be one of three lanes closed.

6.6MILES

M61 Southbound

0.94 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound at the Rivington Services slip road between J8 and J6 | Southbound | Road Works

Location : The M61 southbound entry slip at Rivington Services. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2024 to 23 March 2024. Lanes Closed : All lanes will be closed.

6.7MILES

M6 Southbound

4.99 mile of Wigan
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 J27 southbound access | Southbound | Road Works

Location : The M6 southbound entry slip at junction J27 . Lane Closures : Lane one will be closed. Reason : Emergency roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 09:30 and 15:30 from 19 March 2024 to 21 March 2024. Lanes Closed : There will be one of two lanes closed.

6.9MILES

M61 Southbound

1.03 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound at the Rivington Services slip road between J8 and J6 | Southbound | Road Works

Location : The M61 southbound exit slip at Rivington Services. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2024 to 23 March 2024. Lanes Closed : All lanes will be closed.

7MILES

M62 Westbound

3.35 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J8 and J7 | Westbound | Road Works

Location : The M62 westbound between junctions J8 and J7 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 21 March 2024 to 06:00 on 23 March 2024.

7MILES

M62 Westbound

3.35 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J8 and J7 | Westbound | Road Works

Location : The M62 westbound between junctions J8 and J7 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of three lanes closed.

7MILES

M62 Westbound

3.35 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 westbound between J8 and J7 | Westbound | Road Works

Location : The M62 westbound between junctions J8 and J7 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 21 March 2024 to 06:00 on 22 March 2024. Lanes Closed : There will be two of three lanes closed.

7.2MILES

M61 Southbound

2.73 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J3 and J2 from M61 | Southbound | Road Works

Location : The M61 southbound between junctions J4 and J2 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 2 June 2024 to 06:00 on 3 June 2024. Lanes Closed : There will be two of three lanes closed.

7.2MILES

M6 Northbound

3.33 mile of Warrington
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound within J21A before M62 J10 eastbound exit | Northbound | Road Works

Location : The M6 northbound between junctions J21 and J21A . Lane Closures : Lanes 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 March 2024 to 20 March 2024. Lanes Closed : There will be two of four lanes closed.

7.2MILES

M6 Northbound

3.33 mile of Warrington
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 northbound between J21 and J21A | Northbound | Road Works

Location : The M6 northbound between junctions J21 and J21A . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 March 2024 to 22 March 2024. Lanes Closed : There will be two of four lanes closed.

7.2MILES

M61 Southbound

1.37 mile of Horwich
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J8 and J6 | Southbound | Road Works

Location : The M61 southbound between junctions J8 and J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2024 to 23 March 2024. Lanes Closed : There will be two of three lanes closed.

7.4MILES

M6 Southbound

3.41 mile of Warrington
3/15/2024 at 07:13
Source: Highways Agency
Roadworks

M6 southbound between J21 and J20 | Southbound | Road Works

Location : The M6 southbound between junctions J21A and J20 . Lane Closures : Lanes 1 and 2 are closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 15 March 2024. Lanes Closed : There are two of four lanes closed.

7.4MILES

M62 Eastbound

3.02 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J7 and J8 | Eastbound | Road Works

Location : The M62 eastbound between junctions J7 and J8 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 March 2024 to 06:00 on 23 March 2024. Lanes Closed : There will be two of three lanes closed.

7.4MILES

M62 Eastbound

3.02 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J7 and J8 | Eastbound | Road Works

Location : The M62 eastbound between junctions J7 and J8 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 21 March 2024 to 06:00 on 22 March 2024. Lanes Closed : There will be two of three lanes closed.

7.4MILES

M62 Eastbound

3.02 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J7 and J8 | Eastbound | Road Works

Location : The M62 eastbound between junctions J7 and J8 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 21 March 2024 to 06:00 on 23 March 2024.

7.6MILES

M6 Southbound

3.51 mile of Warrington
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J21 and J20 | Southbound | Road Works

Location : The M6 southbound between junctions J21A and J20 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 18 March 2024 to 06:00 on 19 March 2024. Lanes Closed : There will be two of four lanes closed.

7.6MILES

M6 Southbound

3.51 mile of Warrington
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M6 southbound between J21 and J20 | Southbound | Road Works

Location : The M6 southbound between junctions J21A and J20 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 March 2024 to 06:00 on 16 March 2024. Lanes Closed : There will be two of four lanes closed.

7.6MILES

M62 Eastbound

2.99 mile of Saint Helens
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M62 eastbound between J7 and J8 | Eastbound | Road Works

Location : The M62 eastbound between junctions J7 and J8 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 18 March 2024 to 06:00 on 19 March 2024. Lanes Closed : There will be one of three lanes closed.

7.7MILES

M61 Southbound

2.84 mile of Bolton
3/15/2024 at 09:37
Source: Highways Agency
Roadworks

M61 southbound between J3 and J2 from M61 | Southbound | Road Works

Location : The M61 southbound between junctions J4 and J2 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 March 2024 to 18 March 2024. Lanes Closed : There will be two of three lanes closed.

53.50571
-2.611781